DOC: RB-SVC-001 REV: 05.26 / R2 SEGMENT: THE TWO CAPTURES STATUS: ACTIVE
S.00 · THE TWO CAPTURES

TWO SCANS.
ONE COMPLETE
DIGITAL TWIN.

We capture every premium build at two moments: once after rough-in, before plaster goes on, and once at handover. Together they form a permanent, time-locked record of how the home was built and how it was delivered.

01
S.01 · POST ROUGH-IN · CAPTURE WINDOW: 24–72 HOURS PRE-PLASTER

Pre-Plaster Asset Capture

The single most valuable scan on any build. Every wire, pipe, duct, batten and stud — recorded the day before plaster closes them up forever.

CAPTURE / 01

What gets captured

  • Hidden services mapping — every electrical run, plumbing route, ducting line
  • Frame & stud locations — for future fixings and renovation work
  • Waterproofing membrane & flashing details
  • Battens and noggings (key for future wall hangings)
  • Smoke / wiring junctions, plumbing connections, gas runs
  • Insulation placement & window framing
VALUE / 01

What it protects

  • Defect & dispute claims (visual evidence of installation)
  • "You didn't install this" arguments (trade verification)
  • Wall re-open costs ($3k–$8k each, avoided)
  • Waterproofing disputes ($5k–$20k, avoided)
  • Insurance & warranty claims (date-stamped proof)
  • Renovation planning years later (find what's where)

◉ ALSO CALLED · HIDDEN SERVICES MAPPING · PRE-PLASTER ASSET CAPTURE · PRE-LINING SCAN

02
S.02 · LIVE DEMO · WALK THROUGH A REAL RECORD

This is what your record looks like.

Drag to look around. Click the floor markers to move between scan positions. Your clients and your team get this in their browser, on their phone, on tablet.

KITCHEN · 42m² LIVING / DINING · 68m² BED 1 · 18m² BED 2 · 16m² BATH · 8m² ◉ 5 SCAN POSITIONS · AUTO-GENERATED FROM POINT CLOUD

◉ PUBLIC DEMO SPACE · REPLACE SPACE ID IN services.html TO EMBED YOUR OWN

03
S.03 · POST HANDOVER · CAPTURE WINDOW: AT PRACTICAL COMPLETION

As-Built Handover Archive

The home in its final, delivered state. A permanent reference for your DLP team, your client, your insurer — and your marketing.

CAPTURE / 02

What gets captured

  • Every finished room in its handover condition
  • Joinery, finishes, fixtures, fittings
  • External elevations & outdoor areas
  • Service locations & controls
  • Date-stamped, branded with your logo
  • Handed over with a client portal link
VALUE / 02

What it protects

  • Defect liability period evidence
  • "It was like that when we left" disputes
  • Client maintenance & warranty reference
  • Premium handover experience (the digital gift)
  • Showcase asset for marketing the next build
  • Permanent searchable archive of every home delivered

◉ ALSO CALLED · AS-BUILT DIGITAL RECORD · PERMANENT BUILD ARCHIVE · HANDOVER DIGITAL TWIN

04
S.04 · THE MATH

This is not a photography spend. It's an insurance line item.

Builders don't compare a build record against a Matterport tour or a real estate scan. They compare it against the cost of being wrong once.

$10–50k
Defect investigation
$5–20k
Waterproofing dispute
$2–15k
Electrical strike
$1.5–5k
Full digital build record
05
S.05 · HOW A CAPTURE WORKS

From booking to live record, under a week.

01

Brief us

Build address, stage (rough-in or handover), expected closing-up date. Locked quote back same day.

D + 0
02

Slot in a scan

We schedule before plaster goes on (or just before handover). Most jobs captured within 5 days.

D + 1 to 5
03

On-site capture

A trained operator captures the full build with Matterport Pro3 hardware. 1–3 hours typical.

Same-day
04

Live record

Stitched, branded, hosted. You get a portal link and a one-line embed for your own site.

48 hr
S.06 · GET STARTED

Got walls about to close up?

The pre-plaster window is tight. Get us your build address, stage and closing-up date — we'll have a quote back same day.